RSS

Cost to Build a Home in Vancouver Rises

To learn more about me click here.

Cost to build a home in Vancouver has just gotten more expensive.

  • BC Building Code recently been changed

  • What’s changed and why is it now more costly to build a home in Vancouver

  • Major change - requirement for more insulation installed in the exterior walls

  • a 2 x 6 inch stud wall used to be adequate

  • now a double wall of 2 x 4’s is required

  • either that or you will need to install exterior rigid insulation w/ 2x6 wall - more costly.

  • Why is the city requiring this now? - Blame the environment. :)

  • joking - although capital cost is higher, your future energy heating costs will be lower.

  • Refer to Part 9 of the BC Building Code - look for the highlighted grey areas to learn more about the changes.

Comments:

No comments

Post Your Comment:

Your email will not be published
The data relating to real estate on this website comes in part from the MLS® Reciprocity program of either the Real Estate Board of Greater Vancouver (REBGV), the Fraser Valley Real Estate Board (FVREB) or the Chilliwack and District Real Estate Board (CADREB). Real estate listings held by participating real estate firms are marked with the MLS® logo and detailed information about the listing includes the name of the listing agent. This representation is based in whole or part on data generated by either the REBGV, the FVREB or the CADREB which assumes no responsibility for its accuracy. The materials contained on this page may not be reproduced without the express written consent of either the REBGV, the FVREB or the CADREB.